ITL and Construction of the Stalingrad HPP. Organized on 17.08.50. Closed on 30.05.53 [2]. Stalingradgidrostroy of the Ministry of Internal Affairs from 17.08.50 [1].
GULAG MJ since 02.04.53. EE from 09.09.50.
Stalingrad, PO Box EE-200 on 27.02.53. Construction of the Stalingrad hydroelectric power station [1], the development of stone quarries, the transportation of goods along the Volga 4. 159, construction of a connecting channel between the Volga and Akhtuba, motor depots, warehouses, repair-mechanics, author. And woodworking plant, temporary highways, residential buildings, social and cultural facilities, water supply and sewerage facilities on the left bank of the Volga, rest houses and pioneer camps, a fishing farm [5], construction of residential buildings in Stalingrad, work at plant 264 MRF, in SMU Min. Razgulyaevka, Stalingrad Region, at the Sawmill named after Kuibyshev in the district of st.